Sports complex Zelzate
With Mutec, we helped build the new sports complex in Zelzate. A total of some 500 sportspeople will take up residence there, as the complex will be the new home base for various sports clubs.
Roof structure & fixing method
- Concrete
- PE foil and bituminous vapour barrier
- PIR 100 mm and PIR 2 x 80 mm; mechanically fixed and bonded
- Firestone Ultraply TPO 1.5mm; mechanically fixed and glued
Characteristics
Location
Broeder Leopoldstraat,
9060 Zelzate
Date of construction
2023
Client
Willy Naessens Industrial Buildings
Surface size
1551 m²
Category
Product